March 17, 2011
MISSMAN ANNOUNCES NAME CHANGE, SERVICE IMPROVEMENT, PROMOTIONS

In an effort to provide the best service to our clients with maximum flexibil

 
November 30, 2011
Missman and the 2011 John Deere Classic

Missman was pleased to be part of the plus-70 sponsors of the 2011 <

 
March 17, 2011
2012 Officers and Directors

At the annual Stockholders meeting held yesterday, the following employees we

 
 Read more  

 

Portfolio


AUGUSTANA COLLEGE RECONSTRUCTION AND BIKE PATH

Augustana        Augustana

CLIENTS:              
Augustana College
City of Rock Island, Illinois 

PROJECT PROFILE:            
Concrete Recreation & Pedestrian Trail
6-Span Pedestrian Bridge
Sheet Pile Retaining Walls
Timber Retaining Walls
Nature Trail
Outdoor Classroom
Street Reconstruction
Decorative Lighting
Federal Funding & Coordination

ROLES & RESPONSIBILITIES:           
Project Development Report
Construction Plans and Specifications
Construction Administration

COST OF CONSTRUCTION:
$2.1 Million

           

       

 


RECONSTRUCTION/STREETSCAPE

CLIENT:               
Village of Cambridge, IL

PROJECT PROFILE:             
Concrete Pavement Reconstruction
Stamped & Colored Concrete Crosswalks
Decorative Lighting & Street Clock
Improved On-Street Parking
ADA Accessible Buildings and Sidewalks
Water Main & Storm Sewer

ROLES & RESPONSIBILITIES:           
Preliminary Environmental Site Assessment
Project Development Report
Construction Plans & Specifications
Construction Administration & Observation
Construction Staking

COST OF CONSTRUCTION:
$1.3 Million            
 
           

                 

 


LONG GROVE ACTIVATED SLUDGE SEWAGE

 

CLIENTS:               
City of Long Grove
Verbeke-Meyer Consulting Engineers

PROJECT PROFILE: 
Facility Plan
Aero-Mod Sewage Plant Facilities 
Control Building and Bar Screen Building 
Blowers
Disinfection Facilities
Sludge Handling and Disposal Equipment

ROLES & RESPONSIBILITIES: 
Subconsultant to City Engineering Firm
Structural Engineering
Construction Plans and Specifications
Construction Engineering Services
Coordination with the Iowa Department of
Natural Resources

           
 
           

                 

 


WASHINGTON SQUARE APARTMENTS

CLIENT:
Italo Milani Architect, P.C.

PROJECT PROFILE: 
Rehabilitation of a circa 1876 five-unit Italianate row house

Neighborhood Stabilization Program (NSP) grant funding

Architectural noise abatement

 

ROLES & RESPONSIBILITIES:
Phase I Environmental Site Assessment

HUD Environmental Assessment

NEPA Environmental Assessment components

Noise level calculation

 

COST OF CONSTRUCTION:

$1.6 Million


KISHWAUKEE HEALTH SYSTEMS

           

CLIENT:
Kishwaukee Health Systems

PROJECT PROFILE: 
Campus Improvements including:
Regional Detention
Cancer Care Center
Timber Bridge Crossing
Campus Circulation - Both roads and Walking Paths
Roundabout
Land Development

ROLES & RESPONSIBILITIES:
Project Startup and Planning
Construction Plans and Specifications
Construction Observation

  
 

     
   


SK HAND TOOL - NEW MANUFACTURING BUILDING

         

CLIENT:              
Ideal Industries

PROJECT PROFILE:
Mass Grading
Public Street Improvements
Public and Private Water, Sewer and Storm Sewer
Parking Lot

ROLES & RESPONSIBILITIES:
Project Startup and Planning
Site Work Construction Plans and Specifications
Construction Observation

 

           

       

 


ROCK ISLAND WET WEATHER TREATMENT SYSTEM

CLIENT:               
City of Rock Island

PROJECT PROFILE:             
Increase Capacity of Existing Wastewater Treatment Facility in order to Accommodate Wet Weather Flow with the Addition of the Following:
Screening & Pumping Building
Influent Diversion Structure
Two Wet Weather Clarifiers
Wet Weather Outfall
Dechlorination Building
Gravity Sludge Thickener
Renovations to Existing Wastewater Treatment Facility
Generator Building
Sludge Drying Beds
Utilities Maintenance Garage
Various Civil/Sitework throughout Project 

ROLES & RESPONSIBILITIES:
On-site Representative for the Owner
Construction Observation
Wet Weather Outfall Design

COST OF CONSTRUCTION:
$45,770,000         
 
           

                 

 


MILAN BELTWAY EXTENSION

Beltway   Freeway

CLIENT:
Illinois Department of Transportation; District 2

PROJECT PROFILE: 
4-Lane Highway and Bridges
Unique Interchange System
Advanced Signal Concepts
Roadway Lighting
Concrete Recreation & Pedestrian Trail
Street & Frontage Road Reconstruction
Federal & State Funding Coordination

ROLE & RESPONSIBILITY:
Provided culvert and hydraulic studies, ditch flow studies, grades and storm sewer design.

COST OF CONSTRUCTION:
$55,000,000

AWARDS:
ACEC Illinois 2009 Engineering Excellence Special Achievement Award
NAWIC 2009 Excellence Award


ALLIANT ENERGY FIELD DRAINAGE IMPROVEMENTS

CLIENT:
Bush Turf

PROJECT PROFILE: 
Survey
Field Layout
Underdrain Storm Water Removal System
Grading Plans

ROLES & RESPONSIBILITIES: 
Subconsultant
Construction Grading Plans
Construction Staking


WESTERN ILLINOIS UNIVERSITY LAKE

 

CLIENT:
Western Illinois University

PROJECT PROFILE: 
Dewatering/Lake Drawdown
Lake Bottom Dredging
Grade/Reshape Lake Bottom, Banks & Benches
Bank Stabilization/Seeding
Erosion Control Measures

ROLES & RESPONSIBILITIES:
Soil Sampling – Lake Bottom Material
Beneficial Soil Reuse Coordination
Permit Coordination
Lake Elevation Design - Lake Bottom, Bank & Benches
Wetland Plant & Seeding Design
Plan & Specifications

COST OF CONSTRUCTION:
$15,200