June 18, 2010
MISSMAN ANNOUNCES NEW SYCAMORE OFFICE!

Missman is pleased to announce the opening of our newest office located in Sy

 
May 01, 2010
RECONSTRUCTION OF 5TH AVENUE - MOLINE, IL
Project Awarded: Reconstruction of 5th Avenue - Moline, IL

Construction will begin in the 1400 block of 5th Avenue to 15th Street. Stree

 
April 24, 2010
INTERSTATE 80 RECONSTRUCTION

Improvement consists of I-80 reconstruction from 4 lanes to 6 lanes from the

 
 Read more  

 

MILAN BELTWAY EXTENSION

June 11, 2010

Beltway

Freeway

CLient:
Illinois Department of Transportation; District 2

Role & ResponsibilITY:
Provided culvert and hydraulic studies, ditch flow studies, grades and storm sewer design.

PROJECT DESCRIPTION:
The Illinois Department of Transporation (IDOT) needed to connect the Illinois Quad Cities between the Rock River and the Mississippi River, while maintaining an economic and cost-effective design. This project provided a four-lane connection to the south side of the Rock River, affording easy access to commercial areas north of the river and commercial and residential oppportunities south of the river. During the design and construction phase, Missman was responsible for coordinating mimimal delays of flight patterns with the Quad City International Airport and the Federal Aviation Administration. This completed segment finishes a project which has been in the works since the 1960's. Included is a multi-use path crossing the Rock River, which provides more biking and walking in the area, thus providing a secondary benefit as a result of this project.

Awards:
ACEC Illinois 2009 Engineering Excellence Special Achievement Award